TE Roberts - EOCWD
Provide various 6” bypass pumps, pipe, and related accessories on a rental basis during sewer upgrades.
-
OCSAN - Wet Weather Standby System
Provide fully automated sewer bypass system capable of delivering 30MGD.
-
Myers and Sons
Bypass of entire RP-2 Treatment Plant with flows of 50MGD for a period of approximately 2 months.
-
Kiewit Infrastructure West
Provide a pump rental solution capable of 10MGD with redundancy on a rental basis.
-
LACSD - Emergency Pipeline Rehab
Provide various bypass systems to support emergency pipeline repairs and CIPP lining.
-
Pacific Hydrotech
HATS Diversion Structure Rehab - Provide a fully automated system including redundant SCADA. Peak flow of 24 MGD.
-
OC San - Balboa Trunk Sewer Rehab
Provide sewer bypass and rehabilitate pipeline utilizing CIPP technologies.
-
LBWD - S18 Lift Station Rehabilitation
Provide fully automate bypass system for a period of 5 months during lift station upgrades.
-
OCSAN - Main St. Pumping Plant Emergency
Installation of 10MGD bypass system on an emergency basis during wet weather.